Buying a heat pump in Burnaby
The first useful drawing in a Burnaby heat pump quote is a sketch of the outdoor unit and the property lines. A ground mount beside a detached home, a wall mount above a sloping yard, and a unit on a strata balcony can each call for different approvals and supporting work. Ask installers to quote the actual mounting location and to mark the route to the indoor equipment.
Yard rules and permits
Burnaby's Zoning Bylaw No. 14815 took effect in July 2026. Its general rules allow an outdoor heat pump to project into a required side or rear yard by up to 0.9 m, or by up to 0.6 m if that required yard is less than 1.5 m wide, subject to other applicable provisions. Ask the installer to identify the yard required for your zone and mark the proposed projection on a site plan. Leave room to service the unit and keep access routes clear. [Burnaby's current zoning bylaw](https://www.burnaby.ca/our-city/bylaws/zoning-bylaw) and [its general regulations on yard projections](https://www.burnaby.ca/sites/default/files/acquiadam/2026-06/Part-4-General-Regulations.pdf)
An electric retrofit needs an electrical permit, and changes to gas equipment can require a gas permit. According to the City's 2023 heat pump retrofit guide, a building permit is not required for a self-contained ductless system with a ground-mounted outdoor unit serving an individual dwelling unit, unless the installation requires structural modification; wall or roof mounting needs a building permit with structural drawings prepared by an engineer. The 2023 guide predates the zoning bylaw now in force, so confirm the permit route for your installation with the City. The City's trade permit page also lists a heating system permit for installing or replacing heating and cooling systems in single-family and duplex homes. Ask the installer to identify which permits apply to your exact scope before work starts. [Burnaby's residential trade permits](https://www.burnaby.ca/services-and-payments/development-permits-construction/residential-trade-permits) and [2023 heat pump retrofit guide](https://www.burnaby.ca/sites/default/files/acquiadam/2023-08/Air-Source-Heat-Pump-Retrofit-Info-Guide.pdf)
Burnaby lists continuous residential noise limits of 55 dBA during the day and 45 dBA at night under Noise Bylaw No. 7332. Ask how the proposed location, compressor speed, and vibration isolation affect sound at nearby homes. [Burnaby's residential noise limits](https://www.burnaby.ca/services-and-payments/bylaw-enforcement-and-tickets/noise)
Slopes, low ground, and timing
Burnaby identifies a Fraser River floodplain below the city's steep south slope. On a sloping lot, ask how the installer will keep a pad level and serviceable and where it will direct defrost water. On low ground, show the installer where runoff ponds and ask whether the equipment needs a raised base. Confirm the mounting details before choosing an installation date. [Burnaby's flood prevention guide](https://www.burnaby.ca/services-and-payments/water-and-sewers/flood-prevention)
Start in spring if you want cooling before summer. In a multi-unit building, leave time for the strata and electrical capacity review. Burnaby's multi-unit guide calls for a signed electrical consent form and explains when the building's Annual Operating Permit is part of the application. [Burnaby's multi-unit retrofit guide](https://www.burnaby.ca/sites/default/files/acquiadam/2024-07/Mechanical-Equipment-Installation-and-Retrofits-in-Existing-Multi-Unit-Residential-Buildings.pdf)
What changes the quote
On a steep or narrow lot, levelling and access can change the labour and mounting costs. In a condo, the price can change with the cable route, building electrical capacity, and the work needed to protect and seal the exterior wall. For a ducted retrofit, ask for any return-air or duct changes to be priced separately so you can compare equipment and labour across bids.
Use these questions at each site visit.
- What yard or balcony location did you price, and is the mounting design included?
- Who confirms the permit route, signs off on the design, and books inspections?
- What heating load did you calculate, and how much heat can the proposed model deliver on a cold day?
- If the building needs a load review or the site needs a different mount, how will that change the price?
- What commissioning records, control settings, and warranty terms will I receive?
































